Changes in a project

In the adaptation of the project are finished limit changes to bring the project to the individual investor needs, which do not require the consent of the designer, and relate to:

  • Dimensions of the foundations - resulting from the adjustment object to the ground,
  • Dimensions of sections or spacing elements of rafter framing - resulting from the adaptation a building to the snow / wind zone,
  • types of ceilings - with maintance a construction of storeys,
  • layers of external walls - while maintaining an acceptable coefficient of thermal transmittance,
  • the angle of inclination of the roof to 5 degrees - should be paid attention to the carrying capacity of rafter framing,
  • installation of water and sewage, gas, central heating, electricity - while preserving existing standards,
  • finishing materials - flooring, plaster, roofing tiles, thermal and moisture-proof insulation- while providing the necessary parameters (particularly for change-up roofing) and heat transfer parameters,
  • functional solutions - inside the building and transfer or liquidation of partitions
  • to change the location, quantity and shape of windows and doors,
  • mirror reverse format,
  • the introduction of partial or total cellar building - while maintaining the level of the pavement gorund floor at a height not exceeding 50 cm above the ground level design.

All the changes mentioned above, should be affixed to the project or included as a supplement and signed by an authorized person.